title.gif (10332 bytes)

DST Report Format

When it comes time to run a DST Kanetic Energy (1995) Inc. will be right on top of what is coming up.

As you can see here there is an inflate straddle DST being run down hole & testing is underway.

tower.jpg (42966 bytes)
truck.jpg (38457 bytes)     Sour gas is to be expected with      Firemaster on location.

                                                        DST #1

    Baker Inflate Straddle             2312 m-2324 m             Interval 12 m
    Open Chamber (reset)            Leduc                          

Preflow 10 min. Fair air blow immediately and throughout. No visible signs of hydrocarbons to surface.
Initial Shut-In 60 min.
Valve Open        60 min. 60 min. Strong air blow gas to surface immediately. Strong 5 m to 6m bright orange flare w/dark black smoke. Steady throughout. Estimate gas rate 56,760 m3/day.
Final Shut-In 120 min.

   Recovery:
                        30 m Total consisting of :
                        30 m Drill mud & water: salinity 23,000 ppm.

   Test pressures:                                

Initial Hydrostatic
Initial Preflow
Final Preflow
Initial Shut-In
Final Shut-In
Initial Valve Open
Final Valve Open
Final Hydrostatic
23,000 kpa
2,000  kpa
2,000  kpa
    234  kpa
    234  kpa
1,234  kpa
1,234  kpa
23,234 kpa