DST Report Format
| When it comes time to run a DST Kanetic Energy
(1995) Inc. will be right on top of what is coming up. As you can see here there is an inflate straddle DST being run down hole & testing is underway. |
![]() |
![]() |
Sour gas is to be expected with Firemaster on location. |
DST #1
Baker Inflate Straddle
2312 m-2324 m
Interval 12 m
Open Chamber (reset)
Leduc
| Preflow | 10 min. | Fair air blow immediately and throughout. No visible signs of hydrocarbons to surface. |
| Initial Shut-In | 60 min. | |
| Valve Open 60 min. | 60 min. | Strong air blow gas to surface immediately. Strong 5 m to 6m bright orange flare w/dark black smoke. Steady throughout. Estimate gas rate 56,760 m3/day. |
| Final Shut-In | 120 min. |
Recovery:
30 m Total consisting of :
30 m Drill mud & water: salinity 23,000 ppm.
Test pressures:
| Initial Hydrostatic Initial Preflow Final Preflow Initial Shut-In Final Shut-In Initial Valve Open Final Valve Open Final Hydrostatic |
23,000 kpa 2,000 kpa 2,000 kpa 234 kpa 234 kpa 1,234 kpa 1,234 kpa 23,234 kpa |